<abbr id="z52dw"><optgroup id="z52dw"><strong id="z52dw"></strong></optgroup></abbr><nav id="z52dw"><strong id="z52dw"></strong></nav>
  1. <big id="z52dw"></big>
    1. <u id="z52dw"><video id="z52dw"></video></u>
      <pre id="z52dw"><option id="z52dw"></option></pre>

      国产无码久久,久久99视频,欧洲无码视频,国产免费AV网站,色诱久久,jjzz国产,国产亚洲成人网,橹橹色
      Hotline:400-880-1556

      English




      [Focus] Requirements and content of the new version of IEC 62619:2022, the energy storage battery standard

      Author:中認聯(lián)科 time:2022-08-09 Ctr:2381

      IEC Battery Technical Committee TC 21/SC 21A published the second edition of IEC 62619:2022 on 24 May 2022. Compared with the 2017 version, the detailed changes in the new version are shown in the table below. For changes to the new version, manufacturers need to pay special attention to the following changes, which need to be considered in the early design and development process:

      1. New requirements for moving parts;

      2. Additional hazardous live parts requirements;

      3. Additional battery system design requirements;

      4. Added system lock requirements;

      5. New EMC requirements;

      6. Additional laser triggers the spreading process.

      What's new in the new version

      新版新增.png 

      Modified content of the new version

      新版修改.png 

      The new version deletes the content

      新版刪除.png 

      Laser Triggered Spreading Process

      1. Cell preparation test

      (1) Fully charge the battery according to the method specified by the manufacturer

      (2) Place a thermocouple on the surface of the cell

      (3) Fixed cell

      (4) Determine the laser irradiation plan

      (5) Prepare equipment such as cell temperature measurement

      (6) Set the ambient temperature to 25℃±5℃

      (7) Irradiate the battery with a laser at a certain point and measure the temperature of the battery until the end of the observation

      (8) Turn off the laser when it is observed that the temperature rises rapidly due to the thermal runaway of the cell

      (9) Continue to observe the cell temperature and appearance until the temperature drops to a safe operating range

      (10) View temperature curve to confirm thermal runaway

      (11) The cell prediction shall be repeated 3 times, and if thermal runaway is confirmed in each test under the same conditions, the battery system spread test shall be carried out under the same irradiation conditions

      2. Battery system test

      (1) Fully charge the battery system according to the manufacturer's recommended conditions

      (2) Place a thermocouple on the surface of the cell

      (3) Fix the battery system on the test bench, and the irradiation point on the target cell should be the same or similar to that of the preliminary test

      (4) Prepare and set up equipment for battery system temperature test etc.

      (5) Determine the laser irradiation plan

      (6) Set the ambient temperature to 25 ℃ ± 5 ℃

      (7) Irradiate the target cell with a laser at a certain point and continuously measure the temperature of the monitored cell

      (8) When it is observed that the temperature rises rapidly due to the thermal runaway of the cell, turn off the laser

      (9) Observe and measure the cell temperature and the appearance of the battery system for at least 1 hour

      Warm Tips

      IEC 62619 is a safety standard for lithium secondary batteries used in industrial products. It is cited by power storage systems in many countries and regions and is the basic standard for battery systems in power storage system certification. If you want to know more about the requirements for battery product testing and certification or have battery products that need to be tested and certified, please feel free to contact us, our engineers will serve you as soon as possible!

      Related Articles
      • Gain a comprehensive understanding of EN 18031: Certification Requirements, Procedures and documentation Preparation

      • Analysis of the EU Network Security Standard for Radio Equipment EN 18031

      • New IATA DGR regulations in 2026: Interpretation of compliance points of state of charge (SoC) of lithium battery goods!

      • [Holiday Notice] 2025 ZRLK Mid-Autumn National Day holiday schedule

      Follow Us
      主站蜘蛛池模板: 国产自在线| 熟妇自搞| 久久精品999| 国产AV日韩AV| 国产VA在线视频观看| 啪啪免费网站| 最新不卡av| 第一福利精品导航| 日本大色情www成人亚洲| 天柱县| 国产精品a久久久久| av狠狠操| 久久福利影院| 波多野结衣av88综合| 囯产精品99久久久久久WWW| 久久综合国产| 色福利网| 日韩av区| 91狠狠爱| www婷婷| 少妇人妻视频| 偃师市| 影音先锋成人| 亚非秘?一区二区三区四区| 成人肏屄视频| 雅江县| av青青草| 上海集散中心旅游官网订票| 色墦五月丁香| 亚洲人成人网站| 国产一级黄色电影| 影音先锋成人网站| 亚洲第1色电影。| 国产精品久久久久久ai换脸综合| 久久久久久久久熟女AV| 国产高清A片| 亚洲老熟女| 久久福利导航| 76少妇精品导航久久久久| 亚洲中文字幕版| 午夜亚洲在线|